Drawbacks: Can be tough to correctly estimate project costs which can result in likely profit loss if underestimated. May well not accommodate significant adjustments in project scope. This flower bed edged with significant rocks presents some curved, natural styles to offset the many vertical and angular shapes in the front https://www.amazon.in/gp/product/B0DDXM597S